HISTORIC HIGH CLASS

PICTURES FROM A DISTANT PAST…

REGULAR CUSTOMERS…

pijl-lambrecht

THANK YOU

FOR

THE CONFIDENCE YOU HAVE SHOWN IN OUR COMPANY!

IT KEEPS US MOTIVATED!

pijl-lambrecht
pijl-lambrecht
pijl-lambrecht

BULK TANK VEHICLE MANUFACTURER WITH TRADITION…

FOR YOU, OUR CUSTOMERS WITH AMBITION

1960 The first Lambrecht generation, who started as a blacksmith, had been building blower systems on trucks for a considerable time. As from 1960, the construction of superstructures for bulk transport with pneumatic unloading systems took off.

See “Voeders Debaets” picture

1964 The next generation, Georges Lambrecht-Claeys, builds the first workshop in the Ieperstraat in Kortemark

1970 Construction of the first semitrailers with steered axle

1976 Move from the Ieperstraat to the Hoogledestraat 122 in Kortemark

1978 The first extension of the workshop, by 5000 sq.m, was already being constructed

1980In the early 80s, the current generation came on the scene: Messrs Dany and Luc Lambrecht. Specialization in mechanically steered semitrailers

1991 The in-house-developed computer-controlled steering optimizes the use of swivel axles

1995 Lambrecht continues to grow. Lack of space stimulates the building of a third, then a fourth construction hall.

2006A perfect finish is considered of paramount importance at Lambrecht’s. In addition to a high-tech spray booth, separate sanding areas were integrated.

bedrijf-old1
folder-old
LUCHTFOTO W2
2011 Lambrecht obtains the “Authorized designer” label. As from July, Luc Lambrecht continues to manage the company on his own. In October 2011 already, we obtained the “Conformity of Production” certificate, allowing the vehicles to be registered under the European approval schemes ‘WVTA –WORLDWIDE VEHICLE TYPE APPROVAL’.

In order to maintain these recognitions, Lambrecht is submitted to several stern technical audits every year, which we have passed brilliantly so far!

2012 A complete reorganization of the construction halls A and B was carried out, an additional roller bridge installed.

2013 Lambrecht aims at a pleasant work environment for their employees: refurbishment of the canteen, construction of a First Aid room and R&D rooms.

2014 Reorganization of the construction halls C and D
Extension and renovation of the supply room is also part of the plan.

Our R&D department is working on an innovative Programmable Logic Controller system, allowing to unload with a press of the button!

Enthusiastically on our way!

LOGOTEKEN-LAMBRECHT